Bosowa Group

Mantra modelled financial savings of 780,000 USD in reduced capital and operational expenditure with an ROI of 12 years.

Mantra carried out a load test and field survey to design an energy system for a Bosowa Berlian Motor car dealership in Makassar, Sulawesi. The target was to design an energy system to secure the car dealership and workshop from regular grid power cuts. Mantra designed a 170 kWp solar power system connected to a custom 144 kWh UPS to reduce their dependence on grid power and obtain financial savings over 25 years.

LOCATION
Makassar, Sulawesi

PROPERTY SIZE

PROJECT DESCRIPTION

Systems Engineering:


Implementation:
Mantra Eco Efficiency Savings